亚洲熟妇AV在线观看,天天捋夜操,91豆花人妻,大香蕉伊人在线之薰儿

網(wǎng)站公告-NOTICE
航豐實(shí)業(yè)·產(chǎn)品分類
聯(lián)系我們
濟(jì)南航豐實(shí)業(yè)有限公司

電話:15168870138
聯(lián)系人:龐經(jīng)理

網(wǎng)址:http://www.b10015.cn  

廠址: 德州市禹城市莒鎮(zhèn)產(chǎn)業(yè)園26棟

經(jīng)銷商地址:天橋區(qū)建華五金市場(chǎng)東區(qū)5-1  

魯ICP備09095923號(hào)-1

新聞資訊

當(dāng)前位置:首頁 / 新聞資訊

橋架安裝在不同場(chǎng)合如何接地

在我們使用橋架的過程中,根據(jù)其安裝的場(chǎng)合不同,其采用的接地方式也是不一樣的,那么您知道分別采用的什么樣的接地方法嗎?下面我們?yōu)槟硐嚓P(guān)內(nèi)容。
In the process of using the bridge, the grounding methods are different according to the different installation occasions. Do you know what kind of grounding methods are used? Next, we will sort out the relevant content for you.
橋架可能存在的安裝場(chǎng)合以及如何接地的情況有以下三種:
There are three possible installation situations and grounding methods for the bridge:
1、當(dāng)允許利用橋架系統(tǒng)構(gòu)成接地干線回路時(shí),橋架端部之間連接電阻應(yīng)不大于0.00033歐姆,接地孔應(yīng)絕緣涂層。在1KV及以下中性點(diǎn)直接接地系統(tǒng)中,受電設(shè)備的接地與系統(tǒng)中性線接地相連。
1. When the bridge system is allowed to form the grounding trunk circuit, the connection resistance between the ends of the bridge should not be greater than 0.00033 ohm, and the insulation coating should be removed from the grounding hole. In the 1kV and below neutral point direct grounding system, the grounding of the receiving equipment is connected with the neutral line of the system.
山東電纜橋架
2、裝有處動(dòng)切斷供電裝軒時(shí),橋架的級(jí)長(zhǎng)方向金屬橫截面積應(yīng)不小于規(guī)定值。沿橋架全長(zhǎng)另敷設(shè)接地干線時(shí),每段(包括非直線段)橋架應(yīng)少有一點(diǎn)與接地干線可靠連接。
2. When installing the dynamic cut-off power supply installation, the metal cross-sectional area in the direction of the bridge length shall not be less than the specified value. When another grounding main line is laid along the whole length of the bridge, at least one point of each section (including non-linear section) of the bridge shall be reliably connected with the grounding main line.
橋架安裝在不同場(chǎng)合如何接地
How to ground the bridge in different occasions
3、對(duì)于振動(dòng)場(chǎng)所,橋架不同的安裝場(chǎng)合的接地要點(diǎn)說明:在接地部位的連接處應(yīng)裝置彈簧圈。
3. For vibration places, the grounding points of different installation occasions of bridge: spring coil should be installed at the connection of grounding parts.
電纜橋架之間可利用連接板作為跨接線,把橋架連成一體。在連接板兩端的兩只連接螺栓上加鍍鋅彈簧墊圈,橋架之間用軟銅線進(jìn)行跨接,再將橋架與接地線相連,形成電氣通路。橋架整體與接地干線應(yīng)有不少于兩處的連接。接地作業(yè)完成后需要檢查驗(yàn)收。
The connecting plate can be used as the jumper wire between the cable trays to connect the trays as a whole. Galvanized spring washer is added on the two connecting bolts at both ends of the connecting plate. The bridge is bridged with soft copper wire, and then the bridge is connected with the grounding wire to form an electrical path. There shall be no less than two connections between the whole bridge and the grounding main line. After the completion of grounding operation, inspection and acceptance are required.
 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318
青青草原在线免费影院| 日本无码一区二区三区免费| 欧美日韩精品在线在线| 国产情色综合网| 丝袜丰满熟女视频| 人妻无码久热丝网| 久久午夜乱码一区二区三区| 日本无码一区二区在线| 亚洲AV无码久久久久| 97大香蕉资源| 大香蕉伊人婷婷久久| 欧美国产印度美女啪啪视频| 97色碰| 中国熟妇乱子论| 成人超碰av在线| 久久久久久久久久久久久久大| 日韩伦理久久久久一区二区| 人妻中文字幕播放| 亚洲综合在线观看国产| 欧美一区二区 综合免费| 黄平县| 日韩一区欧美一区欧美| 久久99九九精品| 久久人妻久久人妻中文久久| 亚洲欧美日韩在线一区二区三区| 天天看夜夜看人人鲁| 欧美 一区 二区 日韩| 欧美裸五月婷婷| 亚洲欧洲码免费收看| 亚洲成人色拍| 精品99色| AV无码免费电影| 午夜级青久| 激情5月婷婷一区| 老鸭窝亚洲中文字幕无码| 超碰碰干熟女系列| 高清视频精品一区| 伦理中文91社| 少妇丝袜操喷水| 中文字幕在线一二网曝黑料在线 | 久久久精品久久98|